Principal:  Abra Mining Pty Ltd
Client:  Red Dust Holdings Pty Ltd
Location: Gascoyne Region, Western Australia
Status: In-Progress

The Abra Base Metals project is the development of a mine and processing facility 200km north of Meekatharra, with a 16 year life producing high-value-high-grade lead-silver concentrate.

Survey Dynamics is involved in construction of the new Aerodrome, Tailing Storage Facility and Processing Plant Earthworks.

The scope of works includes:

  • Machine control setup and support on both GPS / UTS / LPS (Trimble, Leica)
  • Drone surveys (PPK) for End of Month Progress reports and environmental reporting
  • Creating control networks used by both surveyors and final trim operators to final trim Aerodrome Runway
  • Assist with proposed design changes, calculating project quantities and creating models for machine control
  • As-constructed surveys, conformance reports